泰索二号发电厂 is located beside Lake Ringedalsvannet in the Tysse Valley in Odda Municipality, Vestland县.
-
1967投入使用
-
220 MW装机容量
-
1033妇女和年生产
The power plant makes use of a height of fall of 735 metres from the nearby Hardangervidda plateau. Establishment of the plant led to the development of the waterfalls Ringedalsfossen and Tyssestrengene with their 300 metres of free fall.
The tunnel that transfers operating water to Tysso II goes around Lake Ringedalsvannet, which is located at about 1,150 metres above sea level. The tunnel is over 15 km long and has a cross section of between 16 and 18 square metres.
The power plant was commissioned in 1967 and is a partially submerged plant, i.e. part of it is located at a level below the outlet. The power plant has two Pelton turbines, each producing 110 MW. The power plant discharges into Lake Ringedalsvannet, which is the reservoir for Oksla power plant.
泰索二号发电厂 is currently leased to Aktieselskapet Tyssefaldene AS (AST), which is also responsible for daily operations.
mg游戏官方网站拥有60个.17 per cent of AST og 71.4 per cent of the power rights. DNN Industrier owns the other 39.83%和28%.6 per cent of the power rights.
公司 | 所有权份额 |
mg游戏官方网站 | 100% |